Re: Linux 2.4.17-pre5

From: Marcelo Tosatti (marcelo@conectiva.com.br)
Date: Sun Dec 09 2001 - 14:38:15 EST


On Sun, 9 Dec 2001, Rusty Russell wrote:

> In message <E16Crs9-0003Gc-00@the-village.bc.nu> you write:
> > > The sched.c change is also useless (ie. only harmful). Anton and I looked
> at
> > > adapting the scheduler for hyperthreading, but it looks like the recent
> > > changes have had the side effect of making hyperthreading + the current
> >
> > I trust Intels own labs over you on this one.
>
> This is voodoo optimization. I don't care WHO did it.
>
> Marcelo, drop the patch. Please delay scheduler hacks until they can
> be verified to actually do something.
>
> Given another chip with similar technology (eg. PPC's Hardware Multi
> Threading) and the same patch, dbench runs 1 - 10 on 4-way makes NO
> POSITIVE DIFFERENCE.
>
> http://samba.org/~anton/linux/HMT/
>
> > I suspect they know what their chip needs.
>
> I find your faith in J. Random Intel Engineer fascinating.
>
> ================
>
> The current scheduler actually works quite well if you number your
> CPUs right, and to fix the corner cases takes more than this change.
> First some simple terminology: let's assume we have two "sides" to
> each CPU (ie. each CPU has two IDs, smp_num_cpus()/2 apart):
>
> 0 1 2 3
> 4 5 6 7
>
> The current scheduler code reschedule_idle()s (pushes) from 0 to 3
> first anyway, so if we're less than 50% utilized it tends to "just
> work". Note that it doesn't stop the schedule() (pulls) on 4 - 7 from
> grabbing a process to run even if there is a fully idle CPU, so it's
> far from perfect.
>
> Now let's look at the performance-problematic case: dbench 5.
>
> Without HMT/hyperthread:
> Fifth process not scheduled at all.
>
> When any of the first four processes schedule(), the fifth
> process is pulled onto that processor.
>
> With HMT/hyperthread:
> Fifth process scheduled on 4 (shared with 0).
>
> When processes on 1, 2, or 3 schedule(), that processor sits
> idle, while processor 0/4 is doing double work (ie. only 2 in
> 5 chance that the right process will schedule() first).
>
> Finally, 0 or 4 will schedule() then wakeup, and be pulled
> onto another CPU (unless they are all busy again).
>
> The result is that dbench 5 runs significantly SLOWER with
> hyperthreading than without. We really want to pull a process off a
> cpu it is running on, if we are completely idle and it is running on a
> double-used CPU. Note that dbench 6 is almost back to normal
> performance, since the probability of the right process scheduling
> first becomes 4 in 6).
>
> Now, the Intel hack changes reschedule_idle() to push onto the first
> completely idle CPU above all others. Nice idea: the only problem is
> finding a load where that actually happens, since we push onto low
> numbers first anyway. If we have an average of <= 4 running
> processes, they spread out nicely, and if we have an average of > 4
> then there are no fully idle processes and this hack is useless.

Rusty,

I've applied the Intel HT code because it is non intrusive.

If you really want to see that change removed, please show me (sensible)
benchmark numbers where the code actually fuckups performance.

Thanks

-
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@vger.kernel.org
More majordomo info at http://vger.kernel.org/majordomo-info.html
Please read the FAQ at http://www.tux.org/lkml/



This archive was generated by hypermail 2b29 : Sat Dec 15 2001 - 21:00:15 EST