Can this be/ is this accomplished with linux and cloned
processes?
One thing about light weight processes is the smaller context
switching time between threads, compared to the larger context
time needed between processes.
With cloned processes, can this be accomplished? Would it need
redoing the scheduler to try to run cloned pids next to each
other, and doing less work then (or would the code necessary to
accomplish this out weigh smaller context switching time).
I don't remember seeing this discussed before, but I may have
just missed it.
mrc
-- Mike Castle .-=NEXUS=-. Life is like a clock: You can work constantly mcastle@cs.umr.edu and be right all the time, or not work at all mcastle@umr.edu and be right at least twice a day. -- mrc We are all of us living in the shadow of Manhattan. -- Watchmen